BID ADVERTISEMENT | ||||||
|---|---|---|---|---|---|---|
ADVERTISEMENT FOR BIDS 1. SEALED BIDS for the furnishing of the necessary materials and construction of NORTHEAST FULTON COUNTY WATER SYSTEM will be received by the County at the office of the Clerk, Board of County Commissioners, 152 South Fulton Street, Suite 270, Wauseon, Ohio 43567 until 10:00 AM, LOCAL TIME and at that time and place will be publicly opened and read aloud. 2. The proposed Work consists of: b. Contract B: Construction of an Elevated Water Tank and all associated Sitework including connection to a proposed Water Main to be constructed under Contract D–II. c. Contract C: Electrical and Instrumentation for prefabricated Water System Booster Pumping Station and Control Valve Vault constructed under Contract A and Elevated Water Tank constructed under Contract B. d. Contract D–I: Construction of approximately 42,720 linear feet of 12 inch Water Main, including service connections and appurtenances, located in Fulton and Swan Creek Townships. e. Contract D–II: Construction of approximately 29,600 linear feet of 12 inch Water Main and appurtenances, located in Amboy Township. f. Contract D–III: Construction of approximately 19,090 linear feet of 12 inch Water Main and appurtenances, located in Amboy Township. This Contract may not be awarded. 3. The Bidding Documents, including Drawings and Project Manual with Specifications, are on file at the office of the Fulton County Sanitary Engineer, 152 South Fulton Street, Suite 240, Wauseon, Ohio 43567, and at the office of ARCADIS Additional copies (in excess of one) of the Drawings and Project Manual may be purchased at a cost of $50 for Contracts A, B, and C Drawings, $100.00 for Contracts D Drawings, and $100.00 for Project Manual. No refund will be allowed for the return of any additional copies. 4. A list of Bidding Documents Plan Holders will be available via the Internet at www.arcadis-us.com. At the top select “Latest Bid Results”. Scroll to the advertising office, then to the project; select “Plan Holders” view option. 5. Each Bidder must be a Bidding Documents Holder as defined in Article 1 of the Instructions to Bidders. 6. The Commissioners of Fulton County, 1. The Commissioners of Fulton County, Ohio anticipate receiving funding from ARRA, WSRLA, OPWC, and CDBG to aid in financing the Project. The requirements for Bidders, Contractors and Subcontractors are explained in the Bidding Documents. 2. Davis-Bacon Wage Determination Federal Wage Rates apply to this Project. 3. All Contractors and Subcontractors involved with the Project will, to the extent practicable, use 4. DOMESTIC STEEL USE REQUIREMENTS AS SPECIFIED IN SECTION 153.011 OF THE REVISED CODE APPLY TO THIS PROJECT. COPIES OF SECTION 153.011 OF THE REVISED CODE CAN BE OBTAINED FROM ANY OF THE OFFICES OF THE DEPARTMENT OF ADMINISTRATIVE SERVICES.
Published: 8/27/2009 | ||||||
| Revision: 9/9/2009 | ||||||
| Back |